Finishing & Handover5 min read
Handover Protocol & Professional Technical Inspection
Step-by-step technical inspection checklist before signing official handover documents: MEP & masonry.
01
MEP & finishing inspection list
Inspect water pressure, floor tile drainage slopes, and electrical outlet specs against blueprint.
Refuse signing final handover receipt until developer rectifies all listed snagging defects.
This is general guidance, not legal or licensed financial advice. Verify with the developer and official contracts before financial commitment.